Gymnase Cavalaire
Pont des Batteries
Passage Rainier II
Pont Mixste du Riou Blanc

Our experience serving businesses

In progress studying :

Wastewater treatment plant of Gresillon 2 (Study realized in collaboration with the DECAMPS’s civil engineering office ). - FRANCE -

Wastewater treatment plant of Cannes - FRANCE -

Wastewater treatment plant of Auvers sur oise (Study realized in collaboration with the SOECO’s civil engineering office). - FRANCE -

Already achieved 

Underground gallery of “Monaco Rainier II ensemble I” – Study project –

This new project will allows an underpass in central Monaco. This structure will then receive a 12-storey building causing an additional complexity to the work.

Project of « Terrasses du port in Marseille » - Study design – a new commercial complex including underground parking on 5 floors. - FRANCE -

Wastewater treatment plant of Persan – Study project - Achievement of a biological pond.

A19 - PI94.9 – Reinforced concrete slab bridge for highway - FRANCE -

Dam of Saron sur l'Oise in France – Study project – Control dam - two 30m fairways - FRANCE -

Removal of the PN1 in Perpignan – Study project - Achievement of an underpass under the SNCF railway with the JMB method.

Wastewater treatment plant of SIA – Study project – Achievement of the construction of the building of sludge treatment of  Marolles St Vrain (Essone) - FRANCE -


Experiments before SUD-EXE

BRIDGE  OF THE "BATTERIES"  (Ingerop)  - Project - Work of a 160 meters long bridge in Les Gorges de la Tinée (06 – France) 

LES GORGES DU LOUP (Ingerop) – Studies of execution - Spectacular reinforcement of the road from its collapse after a landslide and achievement  of a protective cap of a tunnel entrance.

DAM of L’Isle Adam and of Creil (Ingerop) – Studies of execution - Two control dams for the river of l’Oise near Paris.

FISHWAYS for Creil and L’Isle d’Adam (Ingerop) - Studies of execution - In the same context than the dam, we realised the study execution of the fishways for these two dams.

Wastewater treatement plant of Seine Aval (Ingerop) - Studies of execution - One of the biggest construction site in Europe in 2005 with several millions of Euros of study.

Bridge Strengthening prestressed (PSIDP) Highway A52.

Repair of a bridge in Chad after the modifications of the project.

Studies of execution of the bridge joint of Riou Blanc for a private golf in Var.

 

 

Pont d'Ilonse chantier 2010

Expériences antérieures à SUD-EXE

PONT DES BATTERIES (Ingerop)- Etudes d'exécution - Ouvrage de 160m de longueur situé dans les gorges de la Tinée (06) - calcul au séisme

LES GORGES DU LOUP (Ingerop)- Etudes d'exécution - Renforcement spectaculaire de la route précédemment effondrée suite à un glissement de terrain ainsi que la réalisation d'une casquette de protection d'une entrée de tunnel

BARRAGE de l'Isle Adam et de Creil (Ingerop)- Etudes d'exécution - Deux barrages de régulation pour la canalisation de l'Oise dans la région Parisienne

PASSES A POISSONS pour Creil et L'Isle Adam (Ingerop)- Etudes d'exécution - Dans le même contexte que le barrage, nous avons réalisé les études d'exécution des passes à poissons pour ces 2 barrages

USINE DE DENITRIFICATION Seine Aval Achère (Ingerop)- Etudes d'exécution - L'un des plus grand chantier d'Europe en 2005 avec plusieurs centaines de milliers d'Euros d'étude